A. Personal Protective Equipment (PPE)
- Hard hats must be worn at all times on site.
- Safety boots or shoes are mandatory for all workers at all times.
- Shirts must be worn at all times. Removing your shirt on site is strictly prohibited.
- High-visibility vests or shirts must be worn at all times in designated areas, as indicated by signage.
- Additional PPE must be worn as specified in Safe Work Method Statements (SWMS), Safety Data Sheets (SDS), or site signage.
B. Plant & Machinery
- Only competent, trained, and appropriately licensed persons may operate machinery on site.
- Maintain a safe distance from all plant and machinery at all times. Do not enter an exclusion zone without authorisation from the person in charge.
C. Housekeeping
- The work site must be kept clean and tidy at all times — before, during, and after work activities.
- Keep your work area free of waste and debris.
- All access and egress routes must remain clear of tools, rubbish, and building materials at all times.
- No rubbish, including glass or plastic bottles, is to be left in amenities or toilet facilities.
- Glass bottles are strictly prohibited on site.
- All workers must use the designated toilet facilities. Urinating elsewhere on site is strictly prohibited and may result in immediate expulsion.
- Yelling, screaming, or the use of abusive, offensive, or obscene language is not permitted on site.
D. Site Safety & First Aid
- All persons must conduct themselves in a safe manner at all times.
- Any unsafe condition, practice, or behaviour must be reported immediately to your supervisor, the Health and Safety Representative (HSR), or the site safety officer.
- All persons must familiarise themselves with the site's emergency and evacuation procedures upon induction.
- All injuries, no matter how minor, must be reported to the safety officer or first aid officer for treatment and recording.
- All electrical equipment and leads must be tested and tagged in accordance with AS/NZS 3012:2019.
- Power leads must not be left on the ground or slung through formwork. They must be supported on lead stands or hooks.
- Always refer to the relevant Safety Data Sheet (SDS) before using any hazardous substance or chemical on site.
- As guests and visitors to the local area, all personnel are expected to conduct themselves in a manner that reflects positively on Saiyu Construction, both on and off site.
E. Working Hours
- Approved working hours are as follows:
| Day | DA Projects |
|---|
| Monday – Friday | 7:00 AM – 5:00 PM | 7:00 AM – 5:00 PM |
| Saturday | 8:00 AM – 1:30 PM |
| Sunday / Public Holidays | Not permitted |
| Day | CDC Projects |
|---|
| Monday – Friday | 7:00 AM – 5:00 PM |
| Saturday | 7:00 AM – 5:00 PM |
| Sunday / Public Holidays | Not permitted |
F. Grounds for Immediate Expulsion
The following actions will result in immediate removal from all Saiyu Construction sites. Authorities may be notified, and all associated costs, damages, or fines will be passed on to the responsible worker, contractor, or subcontractor.
- Any form of sexual harassment.
- Any form of violence, whether physical or verbal.
- Tampering with, damaging, or stealing property belonging to Saiyu Construction or any other contractor — including but not limited to scaffolding, power boards, power boxes, handrails, kickboards, and edge protection systems.
- Possession or consumption of alcohol or drugs on site.
G. Non-Conformance & Disciplinary Process
- All site rules are non-negotiable. Non-Conformance Reports (NCRs) will be issued for violations.
- Rules 1–22 operate under a three-strike rule. Three strikes may result in expulsion from site or a mandatory re-induction at a cost of $100 per person.
- Rules 23–27 result in immediate expulsion. No warnings will be given.
H. Pre-Commencement Requirements
No person may commence work on a Saiyu Construction site until the following have been confirmed:
- White Card — Completion of the General Construction Induction Training (unit: CPCWHS1001 Prepare to Work Safely in the Construction Industry), evidenced by a valid SafeWork NSW General Construction Induction Card. Interstate cards are accepted in accordance with the Work Health and Safety Regulation 2025 (s.317), provided the card remains valid and the holder has not been out of the industry for more than two consecutive years.
- WHS Work Activity Induction — Completion of a site-specific work activity induction, including review and sign-off of all applicable Safe Work Method Statements (SWMS).
- Site-Specific Induction — Completion of this site induction, including review and acknowledgement of these Site Safety Rules.
Note — Silica Awareness (effective 1 September 2024): Workers performing high-risk crystalline silica processing activities on site (including cutting, grinding, drilling, or polishing of concrete, masonry, or similar materials) must have completed accredited silica awareness training prior to commencing those tasks. Saiyu Construction is required to maintain a Silica Worker Register and notify SafeWork NSW of relevant workers within 28 days of commencement of high-risk silica work, in accordance with the Work Health and Safety Regulation 2025.
A. 个人防护装备(PPE)
- 在工地上必须始终佩戴安全帽。
- 所有施工人员必须始终穿戴安全靴或安全鞋。
- 必须始终穿着上衣;严禁在工地脱去上衣。
- 在指定区域(由标志指示)内,必须始终穿戴高可视性背心或高可视性上衣。
- 必须按照安全工作方法说明(SWMS)、安全数据表(SDS)或现场标志的规定,穿戴相应的个人防护装备。
B. 设备与机械
- 只有具备相应资质、经过培训并持有有效许可证的人员,方可在现场操作机械设备。
- 在任何时候都应与设备和机械保持安全距离。未经负责人授权,严禁进入隔离区。
C. 现场清洁与卫生
- 工地必须在工作前、工作中及工作后始终保持清洁整齐。
- 保持工作区域整洁,清除废料和垃圾。
- 所有进出通道必须始终保持畅通,不得有工具、垃圾或建筑材料阻挡。
- 禁止将任何垃圾(包括玻璃瓶或塑料瓶)遗留在卫生设施或厕所内。
- 工地上严禁携带或使用玻璃瓶。
- 所有工人必须使用指定的厕所设施。严禁在工地其他地方小便,违者可能被立即驱逐。
- 严禁在工地大声喊叫、尖叫,或使用侮辱性、攻击性或猥亵性语言。
D. 现场安全与急救
- 所有人员必须始终以安全的方式行事。
- 发现任何不安全情况、行为或操作,必须立即向主管、健康与安全代表(HSR)或现场安全官员报告。
- 所有人员在完成入职后,必须熟悉工地的紧急情况及疏散程序。
- 所有伤害(无论大小)均须向安全官员或急救员报告,以接受处理并记录在案。
- 所有电气设备及电源线必须按照 AS/NZS 3012:2019 标准进行测试和标记。
- 电源线不得放置在地面或悬挂在模板上,必须使用电缆架或挂钩固定。
- 在使用任何危险物质或化学品前,必须查阅相关的安全数据表(SDS)。
- 作为本地区的客人与访客,所有人员在工地内外均应保持得体行为,维护SAIYU建筑的良好声誉。
E. 工地工作时间
| 日期 | 开发批准(DA)项目 |
|---|
| 周一至周五 | 上午7:00 – 下午5:00 |
| 周六 | 上午8:00 – 下午1:30 |
| 周日/公共假日 | 不允许施工 |
| 日期 | 认证开发(CDC)项目 |
|---|
| 周一至周五 | 上午7:00 – 下午5:00 |
| 周六 | 上午7:00 – 下午5:00 |
| 周日/公共假日 | 不允许施工 |
F. 即时驱逐条款
以下行为将导致当事人被立即驱逐出SAIYU建筑所有工地。相关当局可能会收到通知,因此产生的所有费用、损失或罚款将由责任方(工人、承包商或分包商)承担。
- 任何形式的性骚扰。
- 任何形式的暴力行为,包括肢体暴力和言语暴力。
- 篡改、损坏或盗窃SAIYU建筑或其他承包商的财产,包括但不限于脚手架、配电板、配电箱、扶手、踢脚板及边缘防护系统。
- 在工地持有或饮用酒精,或使用毒品。
G. 违规处理程序
- 所有工地规则均不可协商。违规将出具不合格报告(NCR)。
- 规则1–22适用三次违规制度:累积三次违规可能导致被驱逐出工地,或须重新接受入职培训,费用为每人100澳元。
- 违反规则23–27将被立即驱逐,不予任何警告。
H. 开工前确认要求
任何人员在开始SAIYU建筑工地工作前,必须确认以下事项均已完成:
- 白卡 — 已完成建筑行业一般入职培训(课程代码:CPCWHS1001 为在建筑行业安全工作做准备),并持有有效的新南威尔士州工作安全局颁发的一般建筑入职培训卡。根据《2025年工作健康与安全条例》第317条,持有其他州或领地有效白卡者亦可被接受,前提是该卡仍然有效,且持有人未离开行业超过连续两年。
- WHS工作活动入职培训 — 已完成工地专项工作活动入职培训,包括审阅并签署所有适用的安全工作方法说明(SWMS)。
- 工地专项入职 — 已完成本次工地入职,包括审阅并确认知晓本工地安全规则。
特别说明 — 矽肺(硅尘)安全意识培训(自2024年9月1日起生效): 在工地从事高风险结晶硅尘加工作业(包括对混凝土、砖石或类似材料进行切割、研磨、钻孔或抛光)的工人,在开始相关工作前必须完成经认证的硅尘安全意识培训。根据《2025年工作健康与安全条例》,SAIYU建筑须维护硅尘工人登记册,并在高风险硅尘作业开始后28天内向新南威尔士州工作安全局报告相关工人信息。
Document prepared by Saiyu Construction Pty Ltd | gzhan@saiyu.com.au
Last reviewed: April 2026